Latest News

Leisure Centre Refurbishment. 18 October 2018, 22.19
Leisure Centre Refurbishment.
Two x 15kW SPP Pumps ready for new sports leisure centre swimming pool refurbishment.
MONO Pumps and spares. 17 October 2018, 22.34
MONO Pumps and spares.
Another order for 15 MONO CGH pumps for a UK water authority. If you are have a MONO pump you need
Focus On Energy Saving 04 February 2015, 00.00
Focus On Energy Saving
Our energy saving leaflet is now available to download here. If you would like us to help you reduce your operating
Dartford Crossing - Dry Risers. 29 January 2015, 00.04
Dartford Crossing - Dry Risers.
Precision Pipework Ltd were brought onboard by a major civil engineering firm, to design three dry risers to join the
More News...

Projects

Project text coming soon...

Dry Riser for (temporary) Lowestoft Landmark PDF Print E-mail

We have recently designed and installed a dry riser system to BS 5306: Part1; 1976 consisting of a twin 4" riser for the SLP Accommodation Module currently situated in Lowestoft harbour.

The temporary module is over 100 feet high and requires the dry riser in the event of fire during the construction phase.

Specially designed fabricated brackets made at our works were required for fixing the riser pipework to the external scaffolding.

slp

The SLP Accommodation Module.