Dry Riser for (temporary) Lowestoft Landmark |
We have recently designed and installed a dry riser system to BS 5306: Part1; 1976 consisting of a twin 4" riser for the SLP Accommodation Module currently situated in Lowestoft harbour. The temporary module is over 100 feet high and requires the dry riser in the event of fire during the construction phase. Specially designed fabricated brackets made at our works were required for fixing the riser pipework to the external scaffolding. The SLP Accommodation Module. |