Latest News

Leisure Centre Refurbishment. 18 October 2018, 22.19
Leisure Centre Refurbishment.
Two x 15kW SPP Pumps ready for new sports leisure centre swimming pool refurbishment.
MONO Pumps and spares. 17 October 2018, 22.34
MONO Pumps and spares.
Another order for 15 MONO CGH pumps for a UK water authority. If you are have a MONO pump you need
Focus On Energy Saving 04 February 2015, 00.00
Focus On Energy Saving
Our energy saving leaflet is now available to download here. If you would like us to help you reduce your operating
Dartford Crossing - Dry Risers. 29 January 2015, 00.04
Dartford Crossing - Dry Risers.
Precision Pipework Ltd were brought onboard by a major civil engineering firm, to design three dry risers to join the
More News...

Projects

Project text coming soon...

Sea Water Extraction Project PDF Print E-mail

Precision Pipework Ltd specialise in the area of seawater extraction. We have successfully carried out numerous projects involving land based installations requiring seawater for either experimental or cooling purposes.

Two notable projects involve seawater extraction for Cefas - the Centre for Environment, Fisheries and Aquaculture Science and for the University of St. Andrews in Scotland. Both projects required our in house design and fabrication of bespoke seawater pump systems, plastic filtration systems and all associated pipework.

Hover over each picture for a brief description.

This shows the beach works in preparation for pipework layout and installation.

This shows the beach works in preparation for pipework layout and installation.This shows the basic layout of pumps and filter prior to final fabrication.This shows the basic layout of pumps and filteration after final installation.