Latest News

Leisure Centre Refurbishment. 18 October 2018, 22.19
Leisure Centre Refurbishment.
Two x 15kW SPP Pumps ready for new sports leisure centre swimming pool refurbishment.
MONO Pumps and spares. 17 October 2018, 22.34
MONO Pumps and spares.
Another order for 15 MONO CGH pumps for a UK water authority. If you are have a MONO pump you need
Focus On Energy Saving 04 February 2015, 00.00
Focus On Energy Saving
Our energy saving leaflet is now available to download here. If you would like us to help you reduce your operating
Dartford Crossing - Dry Risers. 29 January 2015, 00.04
Dartford Crossing - Dry Risers.
Precision Pipework Ltd were brought onboard by a major civil engineering firm, to design three dry risers to join the
More News...

Projects

Project text coming soon...

Hot Box PDF Print E-mail

The Hotbox is a product we have designed and built to satisfy the instant hot water demand for a field kitchen in Afganistan for the MOD.

Each Hotbox is capable of delivering instant hot water for six hand basins - indeffinatly. 2 x 24kW 400v inline heaters provide the power whilst a bronze pump keeps the manifold header in circulation thus enabling the temperature to be stabalised.

hb001hb002hb003